Bio-rad ChromLab™ Software User Manual Page 99

  • Download
  • Add to my manuals
  • Print
  • Page
    / 306
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 98
Preparing the Detectors
Instrument Guide | 9 7
4. Connect the tubing to the check valves.
Preparing the Detectors
The NGC systems ship with the conductivity monitor and the UV detectors installed,
calibrated, and ready for use. These modules require no preparation.
The pH module (if installed) requires you to install and calibrate the pH probe. See
the section Replacing the pH Probe on page 218 for information about installing a
new pH probe.
UV Lamps
The UV detector ships with the UV lamps installed. When the instrument starts, the
lamps turn on.
Page view 98
1 2 ... 94 95 96 97 98 99 100 101 102 103 104 ... 305 306

Comments to this Manuals

No comments